Skip to main content

NOTICE: Due to a lapse in annual appropriations, most of this website is not being updated. Learn more.

Form submissions will still be accepted but will not receive responses at this time. Sections of this site for programs using non-appropriated funds (such as NVLAP) or those that are excepted from the shutdown (such as CHIPS and NVD) will continue to be updated.

U.S. flag

An official website of the United States government

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

SANS POLARIZED BEAM

EXPERIMENT SETUP

OPEN NSF COMMUNICATION

A program written in Igor Pro is used for monitoring and controlling the power supplies and a python bridge is used to communicate over the network between the NICE instrument control program and the Igor program.

  • On the 3He computer (member of the Spin Filter team only):
    • Open the Igor program
    • Open the python communication bridge
  • In the NICE client on the User Console:
    • Select the menu option Window > Configure Devices
    • Install 'he3BackPolarization'
      • NOTE: he3FrontPolarization is not usually applicable to SANS
    • If communication is not working, ask Spin Filter Team to check the 3He computer

REGISTER SPIN FILTERS

NICE maintains a list of known cells and related spin filter parameters. By registering a cell through NICE, cell information will be saved in the data file that can be used during the data reduction process.

  • In the NICE console:
    • type 'registerHe3cell <cellName> <deviceName>'
      • e.g. 'registerHe3cell Burgundy he3BackPolarization'

SETUP CELL IN/OUT POSITIONS

  • Manually place the Spin Filter Solenoid on the cradle
    • NG7 SANS:  the Spin Filter installs inside Sample Chamber
      • Set the lab jack to the correct height for a shielded solenoid
      • Manually install the solenoid cradle onto lab jack
      • Manually place the shielded solenoid onto the cradle
      • Ensure solenoid is centered on the beam using laser alignment
      • In NICE, define the cell IN and OUT positions
    • VSANS: Spin Filter installs onto 3He Platform

PERFORMING AN EXPERIMENT

SPIN FILTER MEASUREMENTS

The following steps are necessary transmission measurements (TM) for accurate data reduction: cell in, cell out, and beam block or background (only 1 per configuration). These measurements should be taken at the beginning of each experiment to determine the spin filter starting polarization as a group as well as 2-3 cell in/cell out TMs during each experimental cell lifetime. A final measurement group should be taken before changing spin filters or ending an experiment.

SPIN FILTER TRANSMISSION MEASUREMENTS

  • Set # of attenuators (must be the same for all grouped measurements)
  • Count cell in beam (minimum 2000 counts for statistics, typically 180 sec)
  • Count cell out of beam (minimum 2000 counts for statistics, typically 180 sec)
  • Count beam block or background (typically same count time as above)
    • NOTE: Background measurement should be taken for each configuration

 