The basic schedule of operations is a 7 week cycle entailing 38 days of operations followed by approximately 10 days of down time for maintenance.
To view the complete source operating schedule, please visit the 2018-2019 Operations Schedule
Instrumentation Schedule
Equipment
Neutron Imaging
SANS Instruments
- CHRNS 30 m small angle scattering instrument, current cycle
- NG7 30 m Small Angle Neutron Scattering, current cycle
- CHRNS Ultra-Small Angle Neutron Scattering (uSANS), current cycle
- nSOFT 10 m Small Angle Neutron Scattering
- CHRNS Very Small Angle Neutron Scattering (vSANS)
- Schedules for all facility cycles on all SANS instruments
Reflectometers
- Off-Specular Reflectometer (MAGIK)
- Polarized Beam Reflectometer/Diffractometer (PBR)
- Cold neutron reflectometer - Horizontal Sample Geometry
- CHRNS CANDOR White Beam Reflectometer (not scheduling experiments yet)
Diffractometers
Spectrometers
- BT4 Filter Analyzer Spectrometer
- BT4 Triple Axis Spectrometer
- BT7 Triple Axis spectrometer
- CHRNS Multiple Axis Crystal Spectrometer (MACS)
- CHRNS High Flux Backscattering Spectrometer (HFBS)
- Disk Chopper Time-of-Flight Spectrometer (DCS)
- Spin-polarized triple-axis spectrometer (SPINS)
- CHRNS Neutron Spin Echo spectrometer (NSE)
Neutron Physics
Analytical Chemistry
- Cold Neutron Depth Profiling (CNDP)
- Prompt Gamma Neutron Activation Analysis
- Thermal-neutron prompt-gamma activation analysis