Skip to main content
U.S. flag

An official website of the United States government

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

OWM Recognizes Proficiency Testing Coordinators of the 2025 RMAPs

The Office of Weights and Measures (OWM) Laboratory Metrology Program operates an ISO/IEC 17043 compliant Proficiency Testing (PT) services that assesses the effectiveness of the metrology training efforts for the state laboratory participants and the traceability of the state metrology laboratories to the SI through NIST’s measurement services. Participants of the PT program include federal and commercial laboratories across the U.S., in addition to state legal metrology laboratories.

2025 PT Coordinators and Analysts
2025 PT Coordinators and Analysts during the Combined Regional Measurement Assurance Program, Portland, OR.
Credit: NIST

OWM acknowledges the hard work of the many regional technical experts of the PT program. In 2025, OWM showed gratitude to the PT Coordinators and PT Analysts during the annual Regional Measurement Assurance Program (RMAP) meetings from March 2025 to September 2025. The role of the PT Coordinator is highly important, as the metrologist is responsible for planning, guiding, and coordinating a group of fellow metrologists to facilitate the movement of proficiency test artifacts across a region. In addition, the PT Coordinator keeps a record of any obstacles or challenges that may be faced during the PT such as damage to an artifact during shipping or while at a participant’s laboratory. The PT Analyst, another critical role of the PT Program, gathers resulting calibration certificates for statistical review and reporting, and provides participating laboratories with preliminary feedback. The PT Coordinator and PT Analyst also provide informal mentorship and guidance to proficiency testing participants by ensuring that all follow the agreed-upon PT plan of requirements and process. OWM is grateful for their assistance in kind to the program, as the PT services would not be a success without their cooperation and dedication. 

At the RMAP meetings, OWM was able to provide Certificates of Appreciation to the 2025 PT coordinators and analysts, as they played a critical role in completing 20 PTs across the country, with 18 completed and reported on during the RMAP meetings. The PTs consisted of various mass and volume echelons. There was a total of 9,180 intercomparison points with a success rate of 94.7 %. 

We are most appreciative and proud of the PT coordinators and analysts listed by the RMAP region for the meeting schedule. Congratulations on your achievement!

RMAP Region2025 PT Coordinator/PT Analyst, AffiliationParameter, EchelonUnits
SEMAPEmily Hoyt, PA Lab (formerly MD Lab)Mass, IIIMetric
Megan Money, FL LabMass, I and II & Volume, IIMetric & Gallon
Brad Suggs, Redstone APSL LabVolume, IQuart, Gill
Robert Rogers, NC LabTemperature, NACelsius
WRAPKiara Saunders, NV LabMass, IIIAvoirdupois
Tony Gruneisen, CA LabMass, IIMetric
Leslie German, WA LabVolume, IIGallon
NEMAPJohn Abasto, NH LabVolume, I and Mass, IIIGallon
Jim Gownley, PA LabVolume, I and IIGallon
Jonathan Fox, NY LabLength, NAFeet
SWAPLisa Corn, TX LabMass, IIIAvoirdupois
Clay Ivey, NM LabVolume, IICubic Inches
Mauro Nieves, AZ LabMass, IIIAvoirdupois
MidMAPTom Buck, OH LabMass, IIIAvoirdupois
Johnny Satterlee, Abbott Lab (formerly IL Lab)Mass, IIMetric
Ronald DePouw, WI LabVolume, IICubic Inches
Released October 2, 2026, Updated October 5, 2026
Was this page helpful?