NOTICE: Due to a lapse in annual appropriations, most of this website is not being updated. Learn more.
Form submissions will still be accepted but will not receive responses at this time. Sections of this site for programs using non-appropriated funds (such as NVLAP) or those that are excepted from the shutdown (such as CHIPS and NVD) will continue to be updated.
An official website of the United States government
Here’s how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock (
) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
Investigation of Construction Failure of Reinforced Concrete Cooling Tower at Willow Island, West Virginia (NBS IR 78-1578)
Published
Author(s)
Hai S. Lew, S. G. Fattal, J R. Shaver, T. A. Reinhold, B. J. Hunt
Abstract
The collapse of the natural-draft hyperbolic concrete cooling tower unit no. 2 at the Pleasants Power Station at Willow Island, West Virginia has been investigated. This investigation included onsite inspections, laboratory tests of construction assembly components and concrete specimens, and analytical studies. Based on the results of these field, laboratory and analytical investigations, it was concluded that the most probable cause of the collapse was due to the imposition of construction loads on the shell before the concrete of lift 28 had gained adequate strength to support these loads. The analysis of the shell indicates that the collapse initiated at the part of the shell in lift 28 where cathead no. 4 was located. It further showed that calculated stress resultants at several points in that part equaled or exceeded the strength of the shell in compression, bending and shear. The failure of these points in that part of the shell would have propagated to cause the collapse of the entire lift 28.
Lew, H.
, Fattal, S.
, Shaver, J.
, Reinhold, T.
and Hunt, B.
(1979),
Investigation of Construction Failure of Reinforced Concrete Cooling Tower at Willow Island, West Virginia (NBS IR 78-1578), NIST Interagency/Internal Report (NISTIR), National Institute of Standards and Technology, Gaithersburg, MD, [online], https://doi.org/10.6028/NBS.IR.78-1578
(Accessed October 9, 2025)