NOTICE: Due to a lapse in annual appropriations, most of this website is not being updated. Learn more.
Form submissions will still be accepted but will not receive responses at this time. Sections of this site for programs using non-appropriated funds (such as NVLAP) or those that are excepted from the shutdown (such as CHIPS and NVD) will continue to be updated.
An official website of the United States government
Here’s how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock (
) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
Fire Safety Challenges of Tall Wood Buildings - Phase 2: Task 3 - Cross Laminated Timber Compartment Fire Tests
Published
Author(s)
Joseph Su, Pier-Simon Lafrance, Matthew Hoehler, Matthew Bundy
Abstract
This study quantifies the contribution of cross laminated timber (CLT) building elements to compartment fires and characterizes the effect of gypsum board on delaying or preventing involvement of the CLT in the fire under varied ventilation conditions. Six compartments (9.1 m long x 4.6 m wide x 2.7 m high) were assembled out of prefabricated CLT panels. Each panel was factory assembled using five plies of 35 mm thick lumber for a total thickness of 175 mm. A polyurethane adhesive was used to hold the plies together. The compartment had a rough opening in Wall W2 (front) of 1.8 m wide x 2.0 m high in four tests and 3.6 m wide x 2.0 m high in two tests. The inside of the compartments was fully or partially lined using multiple layers of 15.9-mm thick Type X gypsum board. Real residential contents and furnishings were used to provide a fire load density of 550 MJ/m2. The fire tests were conducted without sprinklers and without firefighting intervention. Test 1-1 served as a baseline for the tests with the 1.8 m x 2.0 m rough opening in the front wall of the structure (Wall W2). Three layers of the gypsum board were used to cover the CLT walls and ceiling in Test 1-1 so that the CLT would neither contribute to the fire nor develop char during the test. Test 1-2 served as a baseline for the tests with the 3.6 m x 2.0 m rough opening in the front wall of the structure (Wall W2). An exposed wall (W1) was tested in both ventilation configurations (Test 1-3 and Test 1-5). Test 1-4 and Test 1-6 involved an exposed ceiling and a combination of exposed ceiling and wall, respectively, with the 1.8 m x 2.0 m rough opening.
Su, J.
, Lafrance, P.
, Hoehler, M.
and Bundy, M.
(2018),
Fire Safety Challenges of Tall Wood Buildings – Phase 2: Task 3 - Cross Laminated Timber Compartment Fire Tests, Fire Protection Research Foundation, [online], https://tsapps.nist.gov/publication/get_pdf.cfm?pub_id=925297
(Accessed October 10, 2025)