Name | CB-42-DA-4MW
|
---|---|
Date | |
Description | Loaded 42 ft composite beam floor test with 3 natural gas burners ramp to 4 MW over 10 min. 3 x 4000 lbs point load. Double angle steel connection to column. |
Specimen | Three box burners
|
Ignition | pilot flame
|
Project ID (s) | |
Test Director | Choe
|
Measurement | Value | Uc | Unit |
---|---|---|---|
Peak Heat Release Rate, PHRR
|
4,182
|
216
|
kW
|
Time to Peak Heat Release Rate
|
14.77
|
0.17
|
min
|
Total Heat Released, THR
|
10,980
|
576
|
MJ
|
Natural Gas Burner Total Heat Released, NGTHR
|
10,772
|
154
|
MJ
|
Heat Release Quality Confirmation, HRQC
|
Not measured | - | MJ/MJ
|
Net Specimen Mass (gravimetric), NM = Mi-Mf
|
Not measured | - | kg
|
Total Fuel Mass Burned, TFM = THR / HOCf
|
220
|
13
|
kg
|
Net Effective Heat of Combustion = THR / NM
|
Not measured | - | MJ/kg
|
O2 Yield = O2 Consumed / TFM
|
3.64
|
0.25
|
kg/kg
|
CO2 Yield = CO2 Generated / TFM
|
2.92
|
0.21
|
kg/kg
|
CO Yield = CO Generated / TFM
|
0.01199
|
0.00084
|
kg/kg
|
Soot Yield = Soot Generated / TFM
|
Not measured | - | kg/kg
|
Baseline Hood Exhaust Flow
|
80.8
|
2.4
|
kg/s
|
Test Duration = Time(Fire Out) - Time(Ignition)
|
67.92
|
0.03
|
min
|
Uc = Combined Expanded Uncertainty with 95% confidence level
Parameter | Value | Uc | Unit |
---|---|---|---|
Fuel Type
|
Natural Gas
|
- | - |
Hood Size
|
15
|
- | m
|
Effective Duct Diameter
|
2.424
|
0.009
|
m
|
Exhaust Flow Correction Factor
|
1.042
|
0.032
|
- |
Net Heat of Combustion (per unit mass O2), Ef
|
12.54
|
0.50
|
MJ/kg
|
Net Heat of Combustion(per unit mass fuel), HOCf
|
50.00
|
1.50
|
MJ/kg
|
Initial Specimen Mass, Mi (gravimetric)
|
Not measured | - | kg
|
Final Specimen Mass, Mf (gravimetric)
|
Not measured | - | kg
|
Event | Time (min) | Description | Video Snapshot Image |
---|---|---|---|
1
|
-87.45
|
data sync marc
|
|
2
|
-84.20
|
start loading floor beam ramp ofr 15 m and hold for 15 m at 12 kips over 3 points
|
|
3
|
-25.12
|
hold loading at 24 kips- spread over 6 points
|
|
4
|
0.00
|
Ignition
|
|
peak
|
14.77
|
Peak HRR
|
|
5
|
30.62
|
load decreased
|
|
6
|
35.40
|
starting cooling phase - ramp burner off over 30 min
|
|
7
|
67.92
|
Fire Out
|
Bryant, R. and Bundy, M. The NIST 20 MW Calorimetry Measurement System for Large-Fire Research, Technical Note (NIST TN) 2077, 2019
https://doi.org/10.6028/NIST.TN.2077
NIST Fire Calorimetry Database (FCD)
https://doi.org/10.18434/mds2-2314