NIST FY 2011 Budget Request
1FY 2011 includes $69.4 M in initiatives and redirection of FY 2010 Congressionally Designated Projects toward FY 2011 ATBs. 2FY 2011 includes $0.4 M in ATBs. 3FY 2011 includes $66.1 M to fund $52.3 M in construction and major renovations (to include $22.0 M of construction drop-out from FY 2010) for Building 1 Renovation ($37.9 M), General Purpose Laboratories ($14.4 M), and $13.8 M in Safety, Capacity, Maintenance, and Major Repair (SCMMR). An additional $0.7 M in ATBs increases SCMMR to $14.5 M from the FY 2010 enacted level. |