NIST logo
*
Bookmark and Share

Return to Waste Clean Up Page

Concept 2: Waste Retrieval System Deployment Sequence

1 2 3 4

5 6 7 8

drawings 1-4 show four steps of deploying a relatively short RoboCrane octahedral gantry, the mast and EMMA using a luffing crane.  Figure 5 shows RoboCrane cable travel speeds and load calculations. Figure 6 shows approximate dimensions of the RoboCrane gantry.  Figure 7 shows the complete system deploying the EMMA.  Figure 8 shows a more conventional platform over the tank and deploying the EMMA into the tank.