Take a sneak peek at the new NIST.gov and let us know what you think!
(Please note: some content may not be complete on the beta site.).

View the beta site
NIST logo
*
Bookmark and Share

Return to Bridge Construction Page

Concept of an Underwater Bridge Column Inspector RoboCrane.  The platform is ballast controlled with a rotary joint and attached sonar sensor.  Close-ups of the winch booms are shown in the upper right.

Br_Col_Insp1