Proposed Plan
National Institute of
Standards and Technology
National Building and
Fire Safety Investigation of the World Trade Center Disaster
Goals:
-
To investigate the building construction,
the materials used, and the technical conditions that combined to cause
the World Trade Center (WTC) disaster.
-
To serve as the basis for:
-
Improvements in the way buildings are designed,
constructed, and used; and
-
Improved tools, guidance for industry and
safety officials, revisions to codes and standards, and improved public
safety.
Objectives:
The primary objectives of the NIST-led
technical investigation of the WTC disaster are to:
-
Determine why and how the World Trade Center
buildings collapsed;
-
Determine why the injuries were so low or
high depending on location, including all technical aspects of fire protection,
response, evacuation, and occupant behavior and emergency response;
-
Determine whether or not state-of-the-art
procedures and practices were used in the design, construction, operation,
and maintenance of the World Trade Center Buildings; and
-
Identify building and fire codes, standards,
and practices that warrant revision.
Source of Information for Plan Development:
The formulation of the NIST investigation
plan will draw on several sources of information. These include the
FEMA/ASCE Building Performance Assessment (BPAT) study, NIST experts in
building and fire safety, external experts and groups (industry and academia),
and the public-at-large. NIST will hold a public meeting to gather
information that will help guide its investigation, including public comments
on the proposed NIST investigation plan1.
The refined plan will be made available for public comment before it is
adopted as final.
Program Context for the Investigation:
The proposed NIST response plan
consists of three key program elements – including an investigation – to
be conducted in parallel. These are:
-
First, a 24-month building and fire
safety investigation into the collapse of the Twin Towers (WTC
1 and 2) and WTC 7. The goal of this program element is to investigate
the building construction, the materials used, and the technical conditions
that combined to cause these disasters following the initial impact of
the aircraft. While WTC 4, 5,and 6 will not be investigated specifically
in this phase, what is learned in examining WTC 1, 2 and 7 is expected
to benefit buildings of all designs.
-
Second, a multi-year research and development
(R&D) program to provide the technical basis to support improved
building and fire codes, standards, and practices. This program element
addresses work in critical areas such as structural fire safety, prevention
of progressive collapse, and equipment standards for first responders.
It includes BPAT recommendations for WTC 3, 4, 5, and 6, Bankers Trust,
and peripheral buildings as well as recommendations for future studies
to address specific issues of broader scope not covered by the BPAT.
The program outputs and recommendations will support the voluntary consensus
process that is used to develop building and fire codes and standards in
the United States.
-
Third, an industry-led dissemination
and technical assistance program (DTAP) that will provide practical
guidance and tools to better prepare facility owners, contractors, designers,
and emergency personnel to respond to future disasters. The DTAP will also
be an important complement to the R&D effort in gaining acceptance
of proposed changes to practice, standards, and codes. This program
element addresses BPAT recommendations for training and education of stakeholders.
The response plan is different from and responsive
to the BPAT efforts. The plan addresses all major recommendations
contained in the BPAT report2. NIST
has also identified other critical issues that need study, especially in
areas that impact life safety and engineering practice.
Scope and Rationale for Investigation:
NIST agrees with the BPAT recommendations
that additional studies of the Twin Towers and WTC 7 should be conducted.
The NIST investigation – one component of the proposed NIST response plan
– will focus on these buildings. The results of such an investigation
could lead to major changes in both U.S. building and fire codes
and in engineering practice, despite the unique design features or circumstances
under which the buildings collapsed. The lessons to be derived from
such an investigation will be applicable to a broad range of buildings
types, not just the specific buildings that are studied. The following
examples are illustrative:
The Twin Towers and WTC 7 are the only
known cases of total structural collapse where fires played a significant
role. These disasters provide a unique source of information to understand
the complexities associated with the dynamics of building fires and the
collapse vulnerability of structures to fires. The investigation
expects to analyze that information to validate generally applicable methodologies
for use in fire safety design and retrofit of structures, and to evaluate
the performance of fireproofing materials and connections used in steel
structures.
In addition, these building disasters provide
a unique source of information to study:
-
The safety and performance of open-web steel
trussed joists under fires. This type of trussed joist is used widely
in floor and roof systems for commercial and institutional buildings nationwide.
-
New mechanisms – not considered previously
– that could initiate progressive collapse in buildings as a result of
fires and impact loads, and the critical role of pivotal components such
as transfer girders and floor diaphragms.
-
The mechanical and metallurgical behavior
of many different grades of structural steel under fires using steel recovered
from the WTC site that is being stored at NIST.
There are equally important lessons for life
safety – which were outside the scope of the BPAT study.
-
Firefighting technologies and practices for
tall buildings, including occupant behavior, evacuation, emergency response,
and the performance of built-in fire protection systems such as sprinklers
and fire alarms.
-
The control of fire spread in buildings with
large open floor plans, and the effectiveness of compartmentation as a
means to isolate fires in such buildings.
There are also important lessons for engineering
practice that were not the focus of the BPAT study.
-
The performance of the design, construction,
and approval processes used to assure safety whenever an innovative structural
system is used or there is a need for variances from building and fire
codes – and whether such practices are adequate to detect and remedy inherent
vulnerabilities.
-
The provision of adequate structural reserve
capacity to accommodate abnormal loads such as blast, impact, and accidental
fires – especially those that can be anticipated prior to construction
– balanced properly against the need to achieve design efficiency.
Technical Approach:
The technical approach of the NIST investigation
will include the following phases over an estimated 24-month period:
-
Identification of Technical Issues and Major
Hypotheses Requiring Investigation: opportunity for public input
(e.g., open meeting; website; Federal Register notice) in developing investigation
plan; convene expert panels to solicit input (experts in structural and
fire protection engineering; experts in construction, maintenance, operation
and emergency response procedures of tall buildings); findings and recommendations
of FEMA-funded study and technical issues identified by other experts;
analyze inputs and establish priorities; review by Federal Advisory Committee.
-
Data Collection: inputs from the Port
Authority of New York and New Jersey (PANYNJ), local authorities, consultants,
and contractors; data and information collected by the FEMA/ASCE BPAT study;
building and fire protection design calculations, records, plans, and specifications;
construction, maintenance, operation records, building renovations and
upgrades; video and photographic data; field data; interviews; emergency
response records including audio communications; and other records.
-
Analysis and Comparison of Building and Fire
Codes and Practices: analysis and comparisons of codes and standards then
and now, and specifications used for WTC buildings; review and analysis
of practices used for design, construction, operation, maintenance, repair,
renovations, and upgrades.
-
Collection and Analysis of Forensic Evidence:
structural steel, material specimens and other forensic evidence to the
extent they have been collected or are otherwise available; metallurgical
and mechanical analysis of steel to evaluate quality and estimate maximum
temperatures; analysis of fire and elevator control panels.
-
Modeling, Simulation, and Scenario Analysis:
aircraft impact on structures and estimate damages to interior and core
structure and residual capacities; role of jet fuel and building contents
in resulting fire; fire dynamics and smoke movement; thermal effect on
structures and the effect of fireproofing; effect of fire, connections,
flooring system, core and exterior columns on structural response and vulnerability;
occupant behavior and response including influence of communications and
barriers to egress; evacuation issues including egress, control/fire panels,
emergency response, and communications; fire protection system design and
vulnerability; competing hypotheses for structural collapse including evaluation
of system vulnerability to progressive collapse; bounds for probable collapse
mechanisms.
-
Testing to Re-Create Scenarios and Failure
Mechanisms: small and some real-scale re-creation tests to provide
additional data and verify simulation predictions, especially effect of
fires (e.g., use and adequacy of standard fire ratings, behavior of connections
and assemblies).
-
Technical Findings and Recommendations:
preparation of interim and final reports; review by established NIST Editorial
Review Board; augmented NIST review to include senior management, legal,
and public affairs; review by Federal Advisory Committee; public comment
period; finalize and disseminate via published reports, web, and media.
-
Dissemination and Deployment of Findings:
develop and disseminate proposed changes to codes and standards based on
findings; participate with industry in their adoption and acceptance into
codes and standards.
At this point, the NIST investigation plan
anticipates organizing around 10 project areas that would provide the focus
for the technical work. These include: (1) aircraft impact analysis
and damage prediction; (2) forensic analysis of structural steel; (3) analysis
of built-in fire protection systems; (4) prediction of thermal environment;
(5) structural fire response and vulnerability; (6) structural collapse
vulnerability and mechanisms; (7) occupant behavior and egress; (8) fire
service technologies and guidelines; (9) fire codes and standards; (10)
analysis of building codes and practices.
Technical Expertise:
The proposed NIST investigation will use
world-class technical expertise from both within and outside NIST.
External experts will be drawn from academia and practice and used on an
as needed basis in various phases of the investigation. Many of these
experts may well have contributed to the BPAT study.
Federal Advisory Committee:
NIST proposes to charter a Federal Advisory
Committee to guide all aspects of the NIST investigation. The Committee
will provide advice on scope, approach, work plan, and schedule; review
and provide advice on results, findings, and recommendations; and review
and provide advice on interim and final technical reports. Committee
meetings will be announced in the Federal Register. Members of the
Panel will be recognized for distinguished professional service, possess
broad technical expertise and experience, and have a reputation for independence,
objectivity, and impartiality. Members of this committee will be
selected to avoid conflicts of interest – they cannot represent parties
that may be affected directly, participate in the conduct of the investigation,
or participate in litigation involving the World Trade Center disaster.
The primary focus of the Panel will be to ensure that the right things
are being done and to provide an independent review of the investigation.
NIST Secretariat:
NIST will establish a secretariat to coordinate
NIST-level activities in support of the proposed investigation and to maintain
ongoing liaison with the Congress, the public, and the media. NIST
recognizes that there will be significant public and media interest in
the investigation. NIST will assign a spokesman to provide press
announcements and media briefings during the course of the investigation.
NIST will also provide information via reports and briefings to Congress
at its request. The secretariat will include representatives of the
Building and Fire Research Laboratory, Congressional and Legislative Affairs,
Budget, Public and Business Affairs, NIST Counsel, Program Office, Acquisition
and Logistics, and Occupational Health and Safety.
Liaison with the Professional Community,
the Public, and Local Authorities:
NIST will maintain ongoing liaison with
the professional community, the public, and local authorities over the
course of the investigation through briefings, presentations, and opportunity
for comment on key investigation reports. NIST will assign a special liaison
to interact with the families of building occupants and first responders.
NIST recognizes the vital role that those individuals and groups have to
play in providing input on the scope of the proposed NIST investigation.
We also understand that it is appropriate and important to keep these families
and organizations informed about the progress of the proposed investigation.
Guiding Principles:
-
Independent and objective technical investigation
that is fully informed of the concerns and issues of all interested parties.
-
Open and inclusive process in planning and
conducting investigation, and in publishing findings and recommendations.
-
Focus on fact-finding, validating/verifying
existing knowledge, and creating new technical and/or scientific knowledge
for the purpose of deriving lessons to improve practice, standards, and
codes and to reduce future risks.
-
Non-technical issues outside scope:
No findings of fault. No determination as to negligence of any individual
or organization.
Impact, Outcomes, and Consequences:
The implementation of the results of the
investigation will be critical to restore public confidence by making tall
buildings safer nationwide, enhance the safety of fire and emergency responders,
and better protect building occupants and property in the future.
In addition, the investigation will be valuable in establishing the probable
technical causes of the disaster, deriving the lessons from the WTC disaster,
and identifying needed improvements to building and fire standards, codes,
and practices and to the safety of tall buildings nationwide.
Specifically, the NIST investigation will
provide an authoritative technical account of:
-
Why and how the World Trade Center buildings
collapsed, including the probable technical causes of the disaster.
-
Why the injuries and fatalities were so low
or high depending on location, including all occupant behavior and response
and evacuation procedures actually experienced.
-
Whether or not then-current procedures were
used in the design, construction, operation, and maintenance of the WTC
buildings.
The NIST results will be supported by careful
and detailed analytical and experimental work.
The results of the investigation will also
underpin and guide future work to develop and disseminate immediate guidance
and tools to assess and reduce vulnerabilities, and produce the technical
basis for cost-effective changes to national practices and standards.
A private sector coalition – representing the key industry, standards,
codes, and professional organizations – has worked with NIST to establish
the response plan (see page 1) to meet these longer-term needs. The
goal of the longer-term program is to produce cost-effective retrofit and
design measures and operational guidance for building owners and emergency
responders.
The specific consequences of not carrying
out this investigation and the broader response plan include: loss
of valuable perishable data that must be collected and archived immediately,
incomplete and lack of objective assessments of building failures and lessons
for the future, unknown vulnerability of existing building stock and lack
of vulnerability assessment tools, lack of operational guidance for building
owners and emergency responders, continuing risk in the performance of
fire protection systems and technical barriers to innovation, unreliable
test methods, outdated design codes and standards for new construction
and lack of information to provide similar guidance to retrofit existing
buildings, and risks associated with ad hoc and prescriptive changes to
building codes that lack technical basis.
Performance Outputs for WTC Investigation
National Building and Fire Safety
Investigation of the World Trade Center Disaster
|
Technical Area
|
Outputs
|
| Identification of Technical Issues and
Major Hypotheses |
-
Public Meetings to gather information to guide
plan for NIST investigation.
-
Report(s) on NIST Investigation Plan Approach
and Process.
|
| Analysis of Building and Fire Codes and
Practices |
-
Report(s) on Analysis of Building and Fire
Codes and Practices.
|
| Aircraft Impact Analysis and Damage Prediction |
-
Report(s) on Aircraft Impact Analysis and
Damage Prediction.
|
| Forensic Analysis of Structural Steel |
-
Report(s) on Forensic Analysis of Structural
Steel.
|
| Analysis of Built-In Fire Protection Systems |
-
Report(s) on Analysis of Built-In Fire Protection
Systems.
|
| Prediction of Thermal Environment |
-
Report(s) on Prediction of Thermal Environment.
|
| Structural Fire Response and Vulnerability |
-
Report(s) on Structural Fire Response and
Vulnerability.
|
| Structural Collapse Vulnerability and
Mechanisms |
-
Report(s) on Structural Collapse Vulnerability
and Mechanisms.
|
| Occupant Behavior and Egress |
-
Report(s) on Occupant Behavior and Egress.
|
| Fire Service Technologies and Guidelines |
-
Report(s) on Fire Service Technologies and
Guidelines.
|
| Fire Codes and Standards |
-
Report(s) on Elevator and Fire Resistance
Standards.
|
| Technical Findings and Recommendations |
-
Interim and Final Reports on the Technical
Findings and Recommendations of the Investigation, including probable technical
causes of the disaster.
|
| Dissemination and Deployment of Findings |
-
Dissemination and Deployment of Findings via
proposed standards and codes changes and participation with industry in
their adoption and acceptance into codes and standards.
|
Note 1 - The proposed
NIST investigation plan, with additional details, will be made available
to the general public two weeks prior to the public meeting.
Note 2 - The graphic
shows how the BPAT recommendations map into the NIST response plan.
|