NIST logo

Publication Citation: Design, Construction and Maintenance of Structural and Life Safety Systems. Federal Building and Fire Safety Investigation of the World Trade Center (NIST NCSTAR 1-1) ***DRAFT for Public Comments***

NIST Authors in Bold

Author(s): Hai S. Lew; Richard W. Bukowski; Nicholas J. Carino;
Title: Design, Construction and Maintenance of Structural and Life Safety Systems. Federal Building and Fire Safety Investigation of the World Trade Center (NIST NCSTAR 1-1) ***DRAFT for Public Comments***
Published: September 01, 2005
Abstract: The collapse of World Irade Center (WTC) 1, 2, and 7 resulted from structural damage from direct and indirect effects of aircraft impact and the ensuing fires. Thus, for collapse analyses of these buildings, knowledge of the physical state of the structural and fire safety systems prior to the aircraft impact is essential. To obtain information for the collapse analysis of the buildings, National Institute of Standards and Technology reviewed design and construction documents, correspondence, and memoranda related to the building projects; interviewed individuals involved in the design, construction, and maintenance of the buildings; obtained information from regulatory and emergency services agencies of New York City; and reviewed books and published journal and magazine articles related to the WTC building projects. Information obtained from various sources are synthesized and summarized in this report. Specifically, this report presents (I) provisions used to design and construct the structural, fire protection and egress systems of the buildings; (2) tests performed to support the design of these systems; (3) criteria that governed the design of the structural and fire protection systems; (4) methods used to proportion structural members and other components of the buildings; (5) innovative features, technologies and materials that are incorporated in design and construction of the structural and fire protection systems; (6) details of deviations to the contract documents granted by Port Authority of New York and New Jersey; (7) fabrication and inspection requirements at the fabrication yard; and (8) inspection protocols during construction. This report also documents the fuel system for the diesel generators that supplied emergency power to many of the tenants in WTC 7. Findings from the synthesis of the information collected and resulting issues are presented.
Citation: NIST NCSTAR - 1-1
Keywords: World Trade Center; high rise buildings; building collapse; disasters; terrorists; terrorism; building design; building construction; maintenance; life safety; building codes; egress; elevators (lifts); fire load; regulations; standards; damage; structural design; inspection; fire safety; codes; fuel systems; stability; stress (mechanics); wind effects; aircraft impact; concretes; steels; floors; structural members; wind tunnels; manuals; architecture
Research Areas: Building and Fire Safety Investigations, World Trade Center Investigation, Building and Fire Research
PDF version: PDF Document Click here to retrieve PDF version of paper (9MB)