NIST Administrative Manual, Subchapter 6.07
Effective Date - 4/30/09

BUILDING 101 COORIDOR UTILIZATION POLICY

Sections

6.07.01  Purpose

6.07.02  Scope

6.07.03  Policy

6.07.04  Authorities

6.07.05  Responsibilities

6.07.06  Corridor Use Procedures

6.07.07  Approval

Appendix A - Selected Extracts from 29 CFR - Maintenance, safeguards, and operational features for exit routes. - 1910.37
 

6.07.01
PURPOSE
This chapter establishes policy for the safe use of corridors for displays and tables within the Building 101 conference facility area at the NIST Gaithersburg location.
 

6.07.02
SCOPE
This subchapter applies to all NIST employees and visitors who use the corridors in the Building 101 conference facility area for conference activities and displays.
 

6.07.03
POLICY
It is the policy of DoC and NIST to provide an effective fire prevention and protection program to reduce loss of life and property from fire and also provide high quality emergency medical care.  All displays and exhibits in the described area must be set up and maintained in accordance with 29CFR Part 1910, NFPA 101 Chapter 7, Means of Egress and Chapter 10, Interior Finish, Contents, and Furnishings and directions provided by the NIST Fire Protection Group (FPG) and  NIST Safety, Health and Environment Division (SHED).
 

6.07.04
AUTHORITIES
29 CFR Part 1910 Subpart E, Means of Egress
 

6.07.05
RESPONSIBILITIES
a. The Public and Business Affairs Office (PBA) Gaithersburg Conference Program Group is responsible for ensuring that all events using the Building 101 conference facility area corridors are conducted in a manner that maintains an adequate means of egress in the event of a fire or other emergencies.

b. The Office of the Chief Facilities Management Officer (CFMO) through the CFMO Emergency Services Division Chief and Fire Chief are responsible for ensuring that this policy on means of egress is followed.

c. The NIST Gaithersburg FPG and NIST SHED are responsible for providing additional guidance or interpretation of the provisions of this policy; conducting periodic inspections of NIST corridors for the purpose of advising corridor users of conditions requiring corrective action and taking immediate action to bring about the removal of items that would prevent safe egress of building occupants.
 

6.07.06
CORRIDOR USE PROCEDURES
a. A minimum of 72 inches width of clear and unobstructed egress shall be maintained at all times in the South Corridor by the Green Auditorium and in the East Corridor by Lecture Rooms A and B.  Any display tables or posters shall be kept to one side of the corridor at all times.  Posters should be hung on poster board to the rear of the tables and on the designated poster display boards across from the Red Auditorium.

b. The West Corridor, by Lecture Rooms C and D shall be kept free and clear of all obstructions.  Unobstructed egress shall be maintained at all times.

c. A display area by the bank of elevators shall be permitted on a limited basis.  Tables may be placed beside the elevators on the south wall facing the permanent NIST exhibits.  No tables will be placed in the immediate vicinity of elevator doors.  All displays shall be constructed of non-combustible materials.  A minimum of 36 inches aisle width must be maintained as a walking space at all times.

d. Lobby displays are permitted on a limited basis.  A single table may be placed by the column near the reception desk.  This guidance applies to the location for the annual holiday celebration tree and Combined Federal Campaign (CFC) display.  In addition to the table, one easel may be placed in front of the column.  These easels may be placed under the LED screen display in the Lobby adjacent to the reception desk along the marble wall.  At no time will the displays impede the means of egress from the Building 101 Lobby from any direction.
 

6.07.07
APPROVAL
No less than 48 hours prior to the event the event sponsor will work with the PBA Gaithersburg Conference Program Group to coordinate pre-approval of plans and set up with the NIST FPG and the NIST SHED.  All displays shall be removed within 48 hours after the end of the event.
 


NIST Home PageSearch
National Institute of Standards and Technology,
Office of the Director - Management and Organization Division
Questions concerning context, contact darla.yonder@nist.gov
Problems/Suggestions, contact gwenda.roberson@nist.gov